Eduardo pulling staples out of the floor. |
02/23/14
Almost
everyday I have been writing for the day before, because I have been so
freaking tired the night of, that I can't stay awake long enough. Yesterday,
despite skipping the gym, and having a lazy morning, was no exception. We got
to the house around 9:30 with a list of things to get done. The first was
figure out how to get the rest of the popcorn ceiling down. We figured it out,
and with the help of some duct tape, and a mop and a spray bottle we got almost
all of it down. My hands and arms were sore from the day before, so as silly as
it sounds, just holding the spray bottle and squirting it was exhausting. Lol.
Yes, I know, I need to work out my arms more! Eduardo had to get up on our
tallest ladder to reach some of the spots and my job was to stand on the first
step of the ladder to stabilize it, and hold on to his legs and the ladder. I
may or may not have wiped my nose on the back of his jeans a couple times while
I was stabilizing...It was really cold inside the house and my nose was runny,
and I didn't want to leave my post.
Next we
started ripping out the carpet. I don't know why certain things gross me out
more than others, but carpet is definitely one of those "things". We
cut the carpet into manageable pieces, rolled it up, and started hauling it out
to the garage. I wore my rubber gloves (my good work gloves are in the truck
that is supposed to be delivered tomorrow) and a mask. Even so, I was still
pretty disgusted. And it stunk really bad of smoke, and mold, and who knows
what else. As we rolled it up I was able to witness what 20 years of stains
looks like...uggg. I think in the future I will probably replace my carpet ever
10 years, just on principle.
We pulled
out the carpet, the padding, those vicious looking tack strips and some of the
staples. It seemed like a lot of the particle board underneath was in rough
shape, and moldy. Upstairs by the doors to the deck the wood was actually wet.
The steps were time consuming and a little difficult, but we just kept at it
and finally we got it done. We only have the two bedrooms left to do tomorrow,
or Tuesday, or whenever we get to it.
The black carpeting turned grey that was in the pink and purple bedroom |
The pink and purple bedroom. UG-LY! |
1st tool Eduardo broke. |
Tack strips and self portrait. |
No comments:
Post a Comment